Read the schedule
Select Table to read and edit names, dates, and dependencies. Select Gantt to read items against a common timeline. In Gantt view, use:- Day, Week, or Month to change the time scale.
- Display as lines or Display as bubble to change the presentation.
- Scrolling and the chart’s zoom controls to inspect a period.
Create an item or group
An item can remain ungrouped. Replace default names and dates before treating a new item as project information.
See Getting started for a complete example.
Rename an item or group
Edit Activity Name in the table to rename an activity or milestone. Use the group’s rename control to change a group name. Renaming preserves identity, dates, and dependencies. Choose names that distinguish items with similar scope, for example Install windows, east wing and Install windows, west wing.Reorganize items
Use Reorganize to arrange groups and items, then save your changes. You can also drag rows in the table to reorder them or move them between groups. Reorganizing changes placement and, when applicable, group membership. It does not reschedule the work or create dependencies. An item belongs to one group at a time. Moving it to Others leaves it ungrouped.Change dates
From the table
- Find the item.
- Change Starting Date or Delivery Date. For a milestone, use Delivery Date.
- Review the previous and proposed dates when the change form opens.
- Add an optional Description explaining the change.
- Select Save.
From the Gantt
Move an activity horizontally to shift its period, or use its date handles to adjust the period. Review the proposed dates and save when prompted. Moving a milestone changes its single date. It remains a single-date event.Consequences
An ordinary date edit changes the current schedule while preserving its baseline reference. The item’s calendar position is recalculated from the resulting dates. If its delivery date changes, any completion confirmation for the previous end is cleared. During the first 24 hours after an item’s creation, web date changes are saved without the usual date-history record. Changes can therefore save directly without opening the normal explanation form. See Date history.Move an activity and its dependents
A whole-period move can affect items connected to it through dependencies. For an established activity with dated successors, the web flow offers:- Move dependent tasks too: shift direct and indirect successors by the same number of calendar days.
- Move only this task: apply the move to the selected item alone.
Add or replace a dependency
In the successor’s Dependency field, select its predecessor. Alternatively, in the Gantt, drag the dependency connector from the predecessor to the successor. Selecting a different predecessor replaces the existing link because each item has one predecessor. Adding or replacing a dependency does not change dates. Check that the dates still describe a coherent sequence. Do not create circular chains in which an item depends on itself indirectly.Remove a dependency
In Gantt view, click the dependency arrow to remove the link. Removing the link leaves the items and their current dates in place. Future moves through that link will no longer affect the former successor.Confirm completion
When an item’s delivery date is before today and its completion is unconfirmed, the table and Gantt provide a completion action.- Check that the item is actually finished.
- Select the action labelled Confirm or adjust end date.
- In the dialog, select Confirm completion.